1 00:00:03,400 --> 00:00:02,540 [Applause] 2 00:00:18,310 --> 00:00:03,410 [Music] 3 00:00:18,320 --> 00:00:21,700 [Applause] 4 00:00:26,120 --> 00:00:24,920 this sixth quarterly film report to the 5 00:00:28,820 --> 00:00:26,130 National Aeronautics and Space 6 00:00:31,690 --> 00:00:28,830 Administration covers progress during 7 00:00:34,639 --> 00:00:31,700 October November and December 1960 on 8 00:00:37,220 --> 00:00:34,649 project Saturn under developmental 9 00:00:38,720 --> 00:00:37,230 supervision of NASA's George C Marshall 10 00:00:41,840 --> 00:00:38,730 Space Flight Center at Huntsville 11 00:00:44,779 --> 00:00:41,850 Alabama shown here in a one-tenth scale 12 00:00:47,360 --> 00:00:44,789 model the Saturn vehicle is designed for 13 00:00:50,139 --> 00:00:47,370 use in orbiting payloads in excess of 10 14 00:00:52,930 --> 00:00:50,149 tonnes launching Mars and Venus probes 15 00:00:55,400 --> 00:00:52,940 affecting soft landings on the moon and 16 00:01:04,219 --> 00:00:55,410 injecting man satellites and space 17 00:01:06,140 --> 00:01:04,229 stations into orbit a major milestone in 18 00:01:08,149 --> 00:01:06,150 the Saturn program was approached during 19 00:01:09,770 --> 00:01:08,159 this report period with virtual 20 00:01:12,830 --> 00:01:09,780 completion of assembly of the first 21 00:01:18,170 --> 00:01:12,840 Saturn booster depicted in this quarter 22 00:01:21,140 --> 00:01:18,180 scale model the booster or s1 stage for 23 00:01:22,820 --> 00:01:21,150 the first flight vehicle called s a1 was 24 00:01:25,450 --> 00:01:22,830 scheduled to be released to the Marshall 25 00:01:33,050 --> 00:01:25,460 Center quality division On January 9th 26 00:01:35,120 --> 00:01:33,060 1961 for inspection and check-out basic 27 00:01:39,050 --> 00:01:35,130 steps in the booster assembly which 28 00:01:41,480 --> 00:01:39,060 began May 28 1968 rest in this series of 29 00:01:45,520 --> 00:01:41,490 drawings including positioning of the 30 00:01:52,719 --> 00:01:48,710 connecting the 105 inch diameter Center 31 00:01:57,670 --> 00:01:52,729 liquid oxygen tank to the tail section 32 00:02:05,450 --> 00:02:01,340 installing the 870 inch diameter LOX and 33 00:02:08,300 --> 00:02:05,460 fuel tanks here the complete booster is 34 00:02:13,430 --> 00:02:08,310 shown on its fixture ready to leave the 35 00:02:15,350 --> 00:02:13,440 shop final assembly accomplished 36 00:02:17,720 --> 00:02:15,360 quarter included installation of the 37 00:02:21,650 --> 00:02:17,730 boosters 8h 1 engines furnished by 38 00:02:24,430 --> 00:02:21,660 Rocketdyne the upper stage support used 39 00:02:27,620 --> 00:02:24,440 for attaching the Saturn's upper stages 40 00:02:29,900 --> 00:02:27,630 upper stage support shroud and the for 41 00:02:34,280 --> 00:02:29,910 instrumentation canisters which carry 42 00:02:36,410 --> 00:02:34,290 control and telemetry equipment a new 43 00:02:39,560 --> 00:02:36,420 series of static test firings of the 44 00:02:43,870 --> 00:02:39,570 modified Saturn test booster SAT one 45 00:02:45,500 --> 00:02:43,880 began this quarter at Marshall on 46 00:02:47,900 --> 00:02:45,510 December 20th 47 00:02:50,480 --> 00:02:47,910 a successful 62nd test of all the 48 00:02:52,700 --> 00:02:50,490 engines was conducted an earlier test on 49 00:02:55,040 --> 00:02:52,710 December 2nd had been terminated by a 50 00:02:57,770 --> 00:02:55,050 malfunction sensor at one point seven 51 00:03:00,200 --> 00:02:57,780 seconds difficulties involving excessive 52 00:03:04,300 --> 00:03:00,210 low temperature of an engine component 53 00:03:10,040 --> 00:03:07,220 plans are now underway for a new Saturn 54 00:03:11,900 --> 00:03:10,050 static test firing stand to be located 55 00:03:14,690 --> 00:03:11,910 about a mile west of the one presently 56 00:03:16,820 --> 00:03:14,700 in use addition to this facility will 57 00:03:18,740 --> 00:03:16,830 enable the center to conduct two booster 58 00:03:21,800 --> 00:03:18,750 captive firing operations in the same 59 00:03:24,229 --> 00:03:21,810 period eight Ron a division of Aerojet 60 00:03:26,390 --> 00:03:24,239 General Corporation has been selected to 61 00:03:28,910 --> 00:03:26,400 do the engineering and design criteria 62 00:03:31,000 --> 00:03:28,920 work on the new stand this phase is 63 00:03:33,350 --> 00:03:31,010 expected to require about seven months 64 00:03:35,900 --> 00:03:33,360 construction contracts will be awarded 65 00:03:38,000 --> 00:03:35,910 separately ultimate cost to the static 66 00:03:42,979 --> 00:03:38,010 test facility will be ten million eight 67 00:03:45,740 --> 00:03:42,989 hundred thousand dollars meanwhile also 68 00:03:48,170 --> 00:03:45,750 in the test area a striking new landmark 69 00:03:50,270 --> 00:03:48,180 rose against the skyline as the new 70 00:03:53,570 --> 00:03:50,280 dynamic test facility shown in this 71 00:03:55,940 --> 00:03:53,580 artist's sketch was erected the 204 foot 72 00:03:58,160 --> 00:03:55,950 tall structural steel tower looms 73 00:04:01,430 --> 00:03:58,170 twenty-seven feet higher than the nearby 74 00:04:03,350 --> 00:04:01,440 static test span the new facility begun 75 00:04:05,810 --> 00:04:03,360 last July will be used to determine 76 00:04:08,120 --> 00:04:05,820 structural bending frequencies of the 77 00:04:10,130 --> 00:04:08,130 entire Saturn vehicle while on launch 78 00:04:11,930 --> 00:04:10,140 support arms and the structural 79 00:04:13,940 --> 00:04:11,940 frequencies of the vehicle while 80 00:04:16,670 --> 00:04:13,950 suspended to simulate free flight 81 00:04:18,500 --> 00:04:16,680 conditions other tests such as pro 82 00:04:20,539 --> 00:04:18,510 current loading and the resultant 83 00:04:22,550 --> 00:04:20,549 structural deflections will be conducted 84 00:04:28,010 --> 00:04:22,560 the facility will be finished in the 85 00:04:33,119 --> 00:04:30,929 as the first Saturn booster was being 86 00:04:35,519 --> 00:04:33,129 put together in the fabrication and 87 00:04:37,409 --> 00:04:35,529 assembly engineering division hundreds 88 00:04:39,089 --> 00:04:37,419 of engineers and technicians were at 89 00:04:41,550 --> 00:04:39,099 work in other Marshall shops and 90 00:04:44,159 --> 00:04:41,560 laboratories building and testing the 91 00:04:47,369 --> 00:04:44,169 many complex components which go into 92 00:04:50,070 --> 00:04:47,379 the great space vehicle for instance 93 00:04:52,559 --> 00:04:50,080 this control computer assembled by the 94 00:04:54,719 --> 00:04:52,569 guidance and control division when the 95 00:04:56,670 --> 00:04:54,729 board the Saturn the control computer 96 00:04:58,890 --> 00:04:56,680 will accept electrical signals from 97 00:05:01,830 --> 00:04:58,900 various sources within the vehicle which 98 00:05:03,600 --> 00:05:01,840 sense vehicle performance then it will 99 00:05:06,330 --> 00:05:03,610 automatically perform suitable 100 00:05:08,339 --> 00:05:06,340 computations and send electrical signals 101 00:05:17,760 --> 00:05:08,349 to the engine swivel apparatus for 102 00:05:20,249 --> 00:05:17,770 proper control of the vehicle flight the 103 00:05:22,140 --> 00:05:20,259 computer is of modular design the 104 00:05:24,390 --> 00:05:22,150 various circuits have been designed as 105 00:05:26,369 --> 00:05:24,400 independent modules which can be 106 00:05:32,450 --> 00:05:26,379 assembled and tested separately and 107 00:05:37,320 --> 00:05:34,829 among other components undergoing 108 00:05:39,990 --> 00:05:37,330 intensive testing at the centre were the 109 00:05:42,119 --> 00:05:40,000 vehicle's telemetry antennas six of 110 00:05:43,860 --> 00:05:42,129 which are used on the booster to radiate 111 00:05:47,219 --> 00:05:43,870 the power generated by the eight 112 00:05:49,230 --> 00:05:47,229 telemetry transmitters in this test the 113 00:05:52,139 --> 00:05:49,240 impedance characteristic of a telemetry 114 00:05:54,420 --> 00:05:52,149 antenna is being plotted the impedance 115 00:05:55,860 --> 00:05:54,430 measurement being made provides an 116 00:05:58,110 --> 00:05:55,870 indication of the antenna performance 117 00:06:01,679 --> 00:05:58,120 over the band of frequencies to be 118 00:06:03,980 --> 00:06:01,689 transmitted in another test an antenna 119 00:06:06,899 --> 00:06:03,990 radiation pattern is being recorded a 120 00:06:09,600 --> 00:06:06,909 120th scale model of a Saturn vehicle is 121 00:06:12,029 --> 00:06:09,610 rotated while a fixed antenna transmits 122 00:06:14,610 --> 00:06:12,039 a radio frequency signal to miniature 123 00:06:16,619 --> 00:06:14,620 antennas on the model the amplitude of 124 00:06:19,379 --> 00:06:16,629 the receive signal is then recorded as 125 00:06:21,869 --> 00:06:19,389 the model rotates providing a plot of 126 00:06:28,709 --> 00:06:21,879 relative signal strength versus viewing 127 00:06:31,679 --> 00:06:28,719 angle in another Marshall laboratory 128 00:06:34,079 --> 00:06:31,689 detailed experimentation involving the 129 00:06:36,420 --> 00:06:34,089 actuators for the Saturn booster was 130 00:06:38,969 --> 00:06:36,430 being carried out hydraulic arms 131 00:06:40,080 --> 00:06:38,979 activated by the vehicles guidance and 132 00:06:42,090 --> 00:06:40,090 control system 133 00:06:44,159 --> 00:06:42,100 the actuators will gimbal the four 134 00:06:46,530 --> 00:06:44,169 outboard engines of the Saturn cluster 135 00:06:48,890 --> 00:06:46,540 of eight during flight to hold a Saturn 136 00:06:51,780 --> 00:06:48,900 on course and maintain proper attitude 137 00:06:54,360 --> 00:06:51,790 the actuators are capable of exerting a 138 00:06:59,190 --> 00:06:54,370 force of 12,000 pounds from a source 139 00:07:01,440 --> 00:06:59,200 pressure of 3000 psi tests check the 140 00:07:03,540 --> 00:07:01,450 ability of the mechanical and electrical 141 00:07:06,090 --> 00:07:03,550 components to satisfy the design 142 00:07:12,330 --> 00:07:06,100 parameters set up as requirements for 143 00:07:15,030 --> 00:07:12,340 gambling the engines as shown in this 144 00:07:17,310 --> 00:07:15,040 single engine static test firing to 145 00:07:24,210 --> 00:07:17,320 provide guidance and control for the 146 00:07:26,670 --> 00:07:24,220 huge vehicle at the Aero ballistics 147 00:07:28,379 --> 00:07:26,680 division the program of aerodynamics 148 00:07:30,390 --> 00:07:28,389 research in development was being 149 00:07:32,810 --> 00:07:30,400 conducted in support of the center's 150 00:07:35,730 --> 00:07:32,820 present and future space programs 151 00:07:37,980 --> 00:07:35,740 examples of this work were the cold jet 152 00:07:40,290 --> 00:07:37,990 tests run to aid in the analysis and 153 00:07:42,960 --> 00:07:40,300 evaluation of the rocket engine floor 154 00:07:45,990 --> 00:07:42,970 the Saturn booster as it impinges on the 155 00:07:48,140 --> 00:07:46,000 launch deflector using a 125th scale 156 00:07:50,580 --> 00:07:48,150 model of the Saturn booster base an 157 00:07:54,600 --> 00:07:50,590 investigation of base flow patterns was 158 00:07:56,670 --> 00:07:54,610 made as high pressure air 500 psi was 159 00:07:58,909 --> 00:07:56,680 exhausted at Mach 3.18 160 00:08:01,980 --> 00:07:58,919 through nozzles onto the model deflector 161 00:08:04,380 --> 00:08:01,990 the flow of the gaseous exhaust of the 162 00:08:07,170 --> 00:08:04,390 Saturn engines is simulated by the air 163 00:08:09,360 --> 00:08:07,180 jet by taking pressure measurements on 164 00:08:12,240 --> 00:08:09,370 the base and by using various flow 165 00:08:14,670 --> 00:08:12,250 visualization techniques engineers can 166 00:08:17,550 --> 00:08:14,680 determine flow patterns that will exist 167 00:08:19,980 --> 00:08:17,560 around the boosters base in January a 168 00:08:22,200 --> 00:08:19,990 pebble bed heater is to be installed in 169 00:08:25,640 --> 00:08:22,210 the air supply so that the engine flow 170 00:08:30,570 --> 00:08:25,650 may be heated to 600 degrees Fahrenheit 171 00:08:33,000 --> 00:08:30,580 as work on the first Saturday us tier 172 00:08:35,370 --> 00:08:33,010 neared completion dummy upper stages 173 00:08:38,040 --> 00:08:35,380 were being built to provide an entire 174 00:08:41,190 --> 00:08:38,050 vehicle to test booster propulsion 175 00:08:44,550 --> 00:08:41,200 control and structure the dummy second 176 00:08:46,740 --> 00:08:44,560 stage called the s4 stage was fabricated 177 00:08:48,990 --> 00:08:46,750 and assembled at Marshall the dummy 178 00:08:52,740 --> 00:08:49,000 stage uses as its principal part a 179 00:08:53,550 --> 00:08:52,750 modified 105 inch diameter tank similar 180 00:08:55,019 --> 00:08:53,560 to that you 181 00:09:02,910 --> 00:08:55,029 for the center tank in the booster 182 00:09:05,639 --> 00:09:02,920 itself steel struts or lingerie is 183 00:09:08,249 --> 00:09:05,649 fabricated at Marshall were joined to 184 00:09:10,350 --> 00:09:08,259 the tank and a metal skin attached thus 185 00:09:14,579 --> 00:09:10,360 bringing the dummy up to the live stages 186 00:09:17,160 --> 00:09:14,589 diameter of 220 inches assembly work 187 00:09:19,319 --> 00:09:17,170 began in late November using an assembly 188 00:09:22,650 --> 00:09:19,329 fixture which had been provided by the 189 00:09:25,110 --> 00:09:22,660 Lockheed Aircraft Corporation the 105 190 00:09:27,299 --> 00:09:25,120 inch tank can be water ballasted to 191 00:09:30,179 --> 00:09:27,309 simulate the weight of the actual second 192 00:09:35,509 --> 00:09:30,189 stage assembly of the dummy is scheduled 193 00:09:41,429 --> 00:09:38,460 Douglas Aircraft Company contractor for 194 00:09:43,860 --> 00:09:41,439 the live s4 stage is now making a 195 00:09:46,170 --> 00:09:43,870 full-scale mock-up of the front and rear 196 00:09:48,960 --> 00:09:46,180 sections of the stage and its plant in 197 00:09:51,449 --> 00:09:48,970 Santa Monica California the mock-up is 198 00:09:53,100 --> 00:09:51,459 necessary for study of problems which 199 00:09:56,879 --> 00:09:53,110 will be involved in building the actual 200 00:10:01,139 --> 00:09:56,889 stage live s for about forty one and a 201 00:10:03,059 --> 00:10:01,149 half feet long will utilize for 17,500 202 00:10:05,819 --> 00:10:03,069 pound thrust liquid hydrogen liquid 203 00:10:08,699 --> 00:10:05,829 oxygen engines developed by the Pratt & 204 00:10:11,009 --> 00:10:08,709 Whitney division of United aircraft the 205 00:10:17,579 --> 00:10:11,019 first three Saturn vehicles flown will 206 00:10:18,749 --> 00:10:17,589 have dummy second stages a dummy third 207 00:10:22,259 --> 00:10:18,759 stage called 208 00:10:25,170 --> 00:10:22,269 s5 is being made by Convair astronautics 209 00:10:28,199 --> 00:10:25,180 at San Diego California convair will 210 00:10:31,259 --> 00:10:28,209 also make the live third stage a 10-foot 211 00:10:33,299 --> 00:10:31,269 diameter modified centaur stage using 212 00:10:35,970 --> 00:10:33,309 two liquid hydrogen liquid oxygen 213 00:10:38,460 --> 00:10:35,980 engines similar to those in the second 214 00:10:42,449 --> 00:10:38,470 stage convair is preparing a proposal 215 00:10:44,850 --> 00:10:42,459 for the s5 contract dummy S five stages 216 00:10:50,369 --> 00:10:44,860 will be used in the first six Saturn 217 00:10:52,499 --> 00:10:50,379 vehicles as the first Saturn V achill 218 00:10:54,449 --> 00:10:52,509 took shape construction of the unique 219 00:10:56,189 --> 00:10:54,459 river barge which will transport the 220 00:10:58,110 --> 00:10:56,199 booster from Huntsville to Cape 221 00:10:59,819 --> 00:10:58,120 Canaveral was being done at Todd 222 00:11:03,480 --> 00:10:59,829 shipyards in Houston Texas 223 00:11:05,759 --> 00:11:03,490 the Saturn booster 82 feet long in 21 224 00:11:07,260 --> 00:11:05,769 and a half feet in diameter is too large 225 00:11:09,900 --> 00:11:07,270 for conventional ship 226 00:11:12,150 --> 00:11:09,910 by rail highway or air so this 227 00:11:15,450 --> 00:11:12,160 one-of-a-kind barge was designed for 228 00:11:16,620 --> 00:11:15,460 NASA by the Army Transportation car cost 229 00:11:18,060 --> 00:11:16,630 to the craft was three hundred 230 00:11:20,940 --> 00:11:18,070 forty-four thousand eight hundred 231 00:11:23,160 --> 00:11:20,950 dollars the barge has been named clayman 232 00:11:26,370 --> 00:11:23,170 for the Greek sea god known as a 233 00:11:28,470 --> 00:11:26,380 protector of ships it is 180 feet long 234 00:11:33,750 --> 00:11:28,480 and thirty eight feet wide and has a 235 00:11:35,810 --> 00:11:33,760 weight displacement of 450 tons while 236 00:11:37,830 --> 00:11:35,820 the playmon was being built in houston 237 00:11:39,930 --> 00:11:37,840 construction of a slip and dock to 238 00:11:41,670 --> 00:11:39,940 accommodate it was completed on the 239 00:11:44,490 --> 00:11:41,680 Tennessee River at the Marshall Center 240 00:11:47,190 --> 00:11:44,500 the booster will be transported by Road 241 00:11:49,410 --> 00:11:47,200 the five miles from the assembly area to 242 00:11:51,660 --> 00:11:49,420 the dock loading and unloading of the 243 00:11:53,670 --> 00:11:51,670 booster will be accomplished by use of a 244 00:11:55,440 --> 00:11:53,680 wheeled carriage or dolly which will 245 00:11:59,250 --> 00:11:55,450 support the booster through all phases 246 00:12:01,650 --> 00:11:59,260 of transit in late November the philemon 247 00:12:05,190 --> 00:12:01,660 arrived at its new homeport in Alabama 248 00:12:07,530 --> 00:12:05,200 after a 16 day 1,500 mile trip along the 249 00:12:09,870 --> 00:12:07,540 intercostal canal from Houston to New 250 00:12:12,390 --> 00:12:09,880 Orleans up the Mississippi River to 251 00:12:14,640 --> 00:12:12,400 Cairo Illinois on the Ohio River to 252 00:12:17,340 --> 00:12:14,650 Paducah Kentucky and then the rest of 253 00:12:19,560 --> 00:12:17,350 the way on the Tennessee loaded with its 254 00:12:21,960 --> 00:12:19,570 booster cargo it will take a similar 255 00:12:23,880 --> 00:12:21,970 trip back to the Gulf of Mexico then 256 00:12:26,660 --> 00:12:23,890 around the southern tip of Florida to 257 00:12:38,980 --> 00:12:26,670 reach Cape Canaveral this route is about 258 00:12:45,350 --> 00:12:43,190 at its destination work is proceeding on 259 00:12:47,720 --> 00:12:45,360 an unloading area where the booster will 260 00:12:49,780 --> 00:12:47,730 be taken off the barge and transported 261 00:12:52,430 --> 00:12:49,790 to the launch site about one mile away 262 00:12:54,980 --> 00:12:52,440 at the launch site itself known as 263 00:12:58,220 --> 00:12:54,990 complex 34 where the Saturn will be 264 00:13:00,380 --> 00:12:58,230 fired in September of 1961 major 265 00:13:02,510 --> 00:13:00,390 structural assembly has been finished on 266 00:13:05,120 --> 00:13:02,520 the 310 foot tall 267 00:13:08,090 --> 00:13:05,130 Saturn service tower second highest 268 00:13:10,250 --> 00:13:08,100 structure in the state of Florida the 269 00:13:12,320 --> 00:13:10,260 Saturn block house completed last July 270 00:13:15,230 --> 00:13:12,330 was being fitted out with interior 271 00:13:16,040 --> 00:13:15,240 equipment such as racks panels consoles 272 00:13:18,710 --> 00:13:16,050 and wiring 273 00:13:21,260 --> 00:13:18,720 work is also underway on the protocol 274 00:13:23,120 --> 00:13:21,270 and servicing area and construction of 275 00:13:27,620 --> 00:13:23,130 the launch pedestal is continuing on 276 00:13:29,810 --> 00:13:27,630 schedule as Complex 34 progresses design 277 00:13:32,090 --> 00:13:29,820 criteria are being established or 278 00:13:34,280 --> 00:13:32,100 construction of a second Saturn space 279 00:13:37,640 --> 00:13:34,290 vehicle launching site to be known as 280 00:13:39,890 --> 00:13:37,650 complex 37 the additional complex will 281 00:13:42,110 --> 00:13:39,900 be needed to support anticipated vehicle 282 00:13:44,570 --> 00:13:42,120 firing rates and to serve as a backup